|
|








Jacksonville Beach Town Center Commons |
* |

Expertise // Performance // Results |
Skiles Davis & Baker, P.A. 1633 San Marco Blvd., Suite 5 Jacksonville, Florida 32207 |
Jacksonville Beach Town Center Commons, Seawalk Pavilion, Jacksonville Beach Pier Parking Lot and Seawalk Reconstruction - Jacksonville Beach, FL While employed with Haskell, Doug Skiles was the civil engineer for several projects performed for the City of Jacksonville Beach. These include the City parking lot at the Town Center Commons (199 spaces), the City parking lot at the Jacksonville Beach Pier (214 spaces), the reconstruction of 1st Street North from Beach Boulevard to 1st Avenue North (720 feet), the Town Center Commons area (2.6 acres), the Seawalk Pavilion and the reconstruction of the existing Seawalk. The design process for each project included many coordination meetings with the City staff. The project permitting included the construction seaward of the coastal construction control line (CCCL) with the Florida Department of Environmental Protection. In addition, the stormwater management was accomplished by demonstrating increased capacity in the vault located beneath Beach Boulevard to the St Johns River Water Management District. |
Public |
Projects |
© 2008 Skiles Davis & Baker, P.A. All rights reserved |